Experience demonstrated through execution.
From stadiums in Riyadh and Dammam to refineries in Rabigh and ports in Yanbu, Strong Point delivers controlled jacking, skidding, heavy lift and heavy transport for the Kingdom's most demanding industrial sites. Every move is engineered, supervised and executed with precision and safety first.
Project information is presented subject to client confidentiality and publication permissions.
Project records
Completed across the Kingdom.
[ 01 / 07 ]Oil & Gas
Sulfur Condenser Replacement by Jacking & Skidding
- Location
- Rabigh
- Client
- Expertise Contracting Co. Ltd (Main Contractor) for PetroRabigh (Project Owner)
Inside a live refinery unit, Strong Point removed and replaced a 45.5-tonne sulfur condenser where crane access was impossible.
View project[ 02 / 07 ]Industrial
Flight Simulator Positioning by Jacking & Skidding
- Location
- Riyadh
- Client
- To be confirmed
Strong Point positioned a high-value simulator into its final installation bay using hydraulic jacking and skidding.
View project[ 03 / 07 ]Infrastructure
Dismantling of PHF Gantry Crane
- Location
- Yanbu Port
- Client
- Saipem
At Yanbu Port, Strong Point dismantled the PHF gantry crane.
View project[ 04 / 07 ]Infrastructure
Handling & Installation of Three Power Transformers
- Location
- Al Khobar
- Client
- SSEN
Strong Point handled and installed three power transformers onto their foundations.
View project[ 05 / 07 ]Infrastructure
Skidding of 10 Chillers at King Fahad International Stadium
- Location
- Riyadh
- Client
- Saudi Binladen Group (SBG)
As part of the stadium's cooling upgrade, Strong Point skidded ten chillers, each weighing 55 tonnes, over 120 metres to the cooling tower area.
View project[ 06 / 07 ]Petrochemical
Heavy Transportation of Industrial Silo
- Location
- Jubail RC to Sipchem Sahara, Jubail Industrial City
- Client
- Zeppelin
Strong Point transported an oversized industrial silo across Jubail Industrial City to its installation site.
View project[ 07 / 07 ]Infrastructure
Generator Handling & Installation at Stadium Project
- Location
- Aramco Stadium, Dammam
- Client
- Aims International
For a major new stadium development in Dammam, Strong Point handled and installed a heavy power generator into its final position.
View project
Project experience
Project experience categories.
- 01
Heavy Lifting
Crane and rigging operations for industrial equipment, structural elements and project installation activities.
- 02
Heavy Transport, Jacking & Skidding
Movement, load transfer and final positioning of transformers and other heavy industrial equipment.
- 03
Scaffolding
Access packages for construction, maintenance, inspection, shutdown and turnaround activities.
- 04
Manpower
Technical, supervisory and skilled workforce mobilisation for industrial projects.
- 05
Equipment Rental
Site plant and equipment packages for construction, maintenance and operational support.
- 06
Civil Works
Foundations, concrete, earthworks and industrial facility-support construction.
- 07
Fabrication
Structural steel, supports, platforms and project-specific industrial metalwork.
- 08
Integrated Packages
Multi-discipline project support combining two or more Strong Point service lines.
Next step
Discuss your next project with Strong Point.
Send your scope and target schedule to sales@spgcc.net.