Projects

Experience demonstrated through execution.

From stadiums in Riyadh and Dammam to refineries in Rabigh and ports in Yanbu, Strong Point delivers controlled jacking, skidding, heavy lift and heavy transport for the Kingdom's most demanding industrial sites. Every move is engineered, supervised and executed with precision and safety first.

Project information is presented subject to client confidentiality and publication permissions.

Project records

Completed across the Kingdom.

  1. [ 01 / 07 ]Oil & Gas

    Sulfur Condenser Replacement by Jacking & Skidding

    Location
    Rabigh
    Client
    Expertise Contracting Co. Ltd (Main Contractor) for PetroRabigh (Project Owner)

    Inside a live refinery unit, Strong Point removed and replaced a 45.5-tonne sulfur condenser where crane access was impossible.

    View project
  2. [ 02 / 07 ]Industrial

    Flight Simulator Positioning by Jacking & Skidding

    Location
    Riyadh
    Client
    To be confirmed

    Strong Point positioned a high-value simulator into its final installation bay using hydraulic jacking and skidding.

    View project
  3. [ 03 / 07 ]Infrastructure

    Dismantling of PHF Gantry Crane

    Location
    Yanbu Port
    Client
    Saipem

    At Yanbu Port, Strong Point dismantled the PHF gantry crane.

    View project
  4. [ 04 / 07 ]Infrastructure

    Handling & Installation of Three Power Transformers

    Location
    Al Khobar
    Client
    SSEN

    Strong Point handled and installed three power transformers onto their foundations.

    View project
  5. [ 05 / 07 ]Infrastructure

    Skidding of 10 Chillers at King Fahad International Stadium

    Location
    Riyadh
    Client
    Saudi Binladen Group (SBG)

    As part of the stadium's cooling upgrade, Strong Point skidded ten chillers, each weighing 55 tonnes, over 120 metres to the cooling tower area.

    View project
  6. [ 06 / 07 ]Petrochemical

    Heavy Transportation of Industrial Silo

    Location
    Jubail RC to Sipchem Sahara, Jubail Industrial City
    Client
    Zeppelin

    Strong Point transported an oversized industrial silo across Jubail Industrial City to its installation site.

    View project
  7. [ 07 / 07 ]Infrastructure

    Generator Handling & Installation at Stadium Project

    Location
    Aramco Stadium, Dammam
    Client
    Aims International

    For a major new stadium development in Dammam, Strong Point handled and installed a heavy power generator into its final position.

    View project